Front doors were replaced in July with a monetary donation from Mr. Roy Maguire in memory of his mother, Mildred Maguire.

School Renovations page please add we are needing funds to maintain the roof. It needs repainted.

Roof repainted and cuppola painted in Sept. 2014 at a cost of $5,350.

Electric upgraded in 2011

The Otter Creek Historical Society, Inc. is in the process of renovating the building. 

The roof was replaced in 2001, with tuck- pointing completed in 2003.  The windows were repaired and painted on the exterior in 2004.  All of this done at a price tag of $115,526.00.

A much needed septic system and bathroom on the main floor have been installed in 2005.

Interior repair and restoration will soon begin.

The roof has been repainted at a cost of $5,350. Necessary maintenance such as painting exterior trim including windows is needed. The front doors are in disrepair also.

If you would like to donate and help preserve this beautiful, historic building, please make check payable to Otter Creek Historical Society, Inc. and mail to 107 E. Main, Otterville, IL 62052.